Construction Technology for Skip Loading Chamber of Mine Main Shaft in Shoushan No.1 MineLiang Zujun, Tong Hongchang6-7,5
Practices on Parallel Operations of Pre - grouting Working Face, Related Chamber and Mine Roadway Construction at Mine Shaft BottomCheng Zhibin, Liu Wenmin8-11
Rapid Construction Technology for No.2 Large Cross Section Inclined Coal Bunker in Tunliu MineLiang Guodong, Zhang Jianjun12-14,25
Application of Directional Breaking Controlled Blasting Technology to Mine Roadway Driving in Soft RockJiang Jinke15-16
Grouting and Water Sealing Technology for Mine Shaft Sinking Face with High Water InrushHe Desheng20-21
Test and Research on Grouting Material for Soft Flow Plastic StrataSong Yuxiang, Liu Yong, Zhu Yongquan26-29