Development Course and Future Direction of Caisson Sinking Technology in China Coal MineFENG Xuhai, BIAN Chao, LONG Zhiyang1-6
Analysis on Stressed Features of Freezing Section and Cracking Causes of Shaft Lining in Mine Inclined ShaftZHENG Tianbin, ZHOU Heng7-12,6
Rod Insertion Method Applied to Construction of Rain Drainage Tunnel in New Preparation Plant of Chengchao MiningLIANG Wan19-21,28
Pre-grouting Technology with Grouting Cover and Static Water Level Applied to Mine Shaft SinkingSHANG Zhihong22-23
Combined Heading Method with Blasting Heading and Fully Mechanized Heading of Mine Large Cross Section Hard Rock Roadway in Huaibei Mining AreaXUAN Xiao, WU Deyi24-28
Orientation of Branch Hole with Small Curvature RadiusZHANG Aiwei, LIU Dajin, BI Haitao, ZHAO Xiaoming29-33
Test Study and Mechanism Analysis on Impermeability of Polypropylene Fiber ShotcreteFANG Jianghua, JIANG Pingwei, PANG Jianyong38-44