Engineering Practices on New High-rise Buildings Crossing Over Goaf of Old Coal MineJIA Zhaoyuan, SHANG Jianfei, WANG Mingli, ZHAO Youxing1-5,21
Comparison and Selection of Mine Gateway Layout in Mining Block of Yuxin Ventilation Shaft Engineering in Yuwu MineZHANG Bao6-8
Rapid Construction of Air Return Vertical Shaft in No 4. Panel of Tashan Coal MineXUAN Jianjun, ZHANG Guangqiang, HAN Weidong9-13
Analysis and Control of Freezing Wall Water Permeability During Trial Excavation of Mine Ventilation Shaft in Shila Wusu Coal MineLI Xiaowei, ZENG Fanyi14-16,60
Directional Drilling and Grouting Technology Applied to Mine Water Disaster Prevention and Control in Coal MineSUN Xiaoyu, TIAN Le, AN Xuliang, DENG Yun17-21
Transportation Technology of Large Drilling and Grouting Equipment from Surface Ground to Underground MineLI Guanghong, HE Wen22-25
Elimination on Interference Signals of Transient Electromagnetic Advanced Detection in Mine Roadway HeadingLIN Guohua, HU Xiongwu26-33
Experiment Study on Backfilled Cement Mortar in Liner of Full Face Boring ShaftFU Xinpeng, JING Guoye, HAN Bo, PENG Ming34-37
Simulation on Stability Control of Gob-side Roadway with Small Coal PillarZHANG Haijiao, SUN Lele, KANG Yongshui38-43
Study on Closed Support Technology of Soft Rock Mine Roadway in 1000 m Deep Mine ShaftJIANG Zhiyun, LI Bingbing, CHENG Lixing44-48