Rapid Construction at Junction Section of Open Channel and Blind Tunnel in Slop RampGAO Changbao, ZHAO Mingxiang, ZHOU Genming, GAO Han, ZHANG Qingcheng5-7,4
Analysis on Application of Overall Stability Line Measurement Technique for Cross Line Relocation in Vertical ShaftZHANG Weiguo11-13,4
Exploration and Treatment of Concealed Collapse Column in Roadway with Pressure MiningZHOU Peng, GUO Rui, LAN Tianlong14-18,26
Construction with Pipe Sheds and Steel Arch Supports Pass through Collapse Section of Inclined ShaftHUANG Baolong19-22
Application of Grouting Technology in Control Shaft Water InrushWANG Shaoqun, ZHANG Wenfeng, NIU Junsheng, LIU Bin23-26
Study on Distribution Law of Strong Rock Pressure and Support Technology in Fully Mechanized Mining Coal Working Face of Thick Coal SeamWANG Chaoyin, ZHANG Xiang27-31
Experimental Study on Influence of Water Temperature and Water Agent Ratio on Expansion Performance of Soundless Cracking AgentLI Yangyang32-35,22