Application of Site Pouring Pile under Water to Construction of Mine Shaft through Flowing Sand StrataChen Fei, Yang Yufei, Li Meiji3-4
Statement on Anti Cracking Construction Technology for Large Volume Concrete StructureFu Deng'an, Li Xingjie5-6,41
Application of Permanent Headframe Directly Set at Mine Shaft for Mine Shaft Freezing SinkingZhang Jun, Guo liansheng10-12
Pilot Prevention Belt Longitudinal Tearing Device Applied to Mine Belt ConveyorMao Pinghuai, Zhang Anning17-19
Research on Ultra Displacement and Deformation Control Basic for Peak Section of Wuqiaoling TunnelLin Baolong, Jia Xiaoyun, Li Wenjiang20-23,4
Research on Blinding Ratio of High Strength Concrete for Outer Wall of Mine Freezing Shaft in Deep and Thick Overburden邵红才, 郁浩, 宋雷, 刘伟24-26