BIM technology's comprehensive application in the construction phase of the ore-pass fragmenting system chamber
HE Lei
WU Chenxu
CHEN Kunfu
Abstract:In response to the national intelligent policy,promote the application of BIM(Building Infor-mation Modeling)in mine construction.Using the metric common model functional module and para-metric modeling method in Revit to complete the construction of basic space families and structural families and Establish the control axis network to combine the models into a complete model of the Ore-pass fragmenting system;In the later stage,Navisworks was used for 3D visualization of the ore-pass system model,and to simulate the construction plan,and to simulate the sequential construction progress for the chamber.Displaying BIM's handling and positioning of the relatively messy spatial relationships between various models,the exhibition of high-precision components and tunnel models,the simulation of complex construction techniques,and its role in the sequential construction order of the chamber.It indicates that the application of BIM in mining construction can speed up the compre-hension of plane drawings and strengthen the cooperation among different construction departments,thereby reducing the construction duration of the mine.It shows that the application of BIM in mining construction can expedite the comprehension of plane drawings,strengthen the cooperation among dif-ferent construction departments,and thereby reduce the construction duration of the mine and BIM has certain reference value for promoting the intelligent construction of mine.
Keywords:BIMmine engineeringlarge cross-section cavernmodel detailed designparametric model-ing
Publication Date:2025-08-10
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 22-28 )
