Analysis of hydrologic hole anomaly by freezing method of north inlet air shaft in Xuchang Iron Mine
WANG Long
Abstract:Freezing construction technology has been adopted in the north inlet air shaft of Xuchang Iron Mine.Due to the long downtime after the completion of the hydrologic hole construction,the o-riginal hydrologic hole failed.As a result,the new hydrologic hole was re-constructed when work re-sumed ten years later,and a number of measures were taken to ensure that the new hydrologic hole accurately reflected the intersection of the freezing wall,providing valuable reference experience for similar projects in the future.
Keywords:shaftfreezing methodhydrologic holefrost heaving water calculationwater level observa-tion
Publication Date:2025-02-24
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2025,46(1)