Study on Excavation Sequence Adj ustment of Shallow Depth and Underground Excavated Large Cross Section Tunnel in Water-rich and Weak Stratum
YANG Ning
FU Cai
YANG Zhigang
WEI Kedong
Machine-generated Keywords:
Publication Date:2022-08-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:8( 13-20 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2022,43(4)