Construction of S-Curve Ramp with Freezing Method for High Salt and Watery Sand Layer by the Sea
LIU Jinsheng
XIAO Zebo
WU Xinguang
LIU Liangpeng
LI Pingyuan
Machine-generated Keywords:
Publication Date:2021-12-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 21-25 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2021,42(6)