Risk Analysis and Control Measures of SBM Construction-based on Shaft Engineering of Ninghai Pumped-Storage Hydroplant as Example
MENG Jihui
XIA Wanqiu
PENG Zebao
NIU Mengjie
TIAN Yanchao
Machine-generated Keywords:
Publication Date:2021-12-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 1-6,11 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2021,42(6)