Measures to Control Broken Floor and Water Inrush with Sands from Floor in Mine Auxiliary Inclined Shaft of Yinhe Mine
DU Fangjun
LIU Zhijun
WU Yarong
YU Zhirang
YANG Xiping
QIAN Ziwei
Machine-generated Keywords:
Publication Date:2021-04-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 22-24,53 )
