Study on Pre-grouting Design of Mine Blind Shaft with Depth over 1000 m
SUN Bangtao
HE Wen
Machine-generated Keywords:
Publication Date:2021-04-25
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 5-11 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2021,42(2)