Research on Causes of Abnormal Water Emitting from Hydrological Hole and Judgment Methods of Frozen Wall Connection for Construction Shaft by Freeze Sinking Method in Coal Mine
TANG Yongzhi
TANG Jiangming
YAO Zhishu
Machine-generated Keywords:
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 1-5 )
