Stability Analysis on the Walling Structural of 1 500-meter-deep Auxiliary Shaft in Sishanling Iron Ore
ZHAO Xing-dong
LI Yang-yang
LIU Yan-yan
XU Ji-tao
ZHANG Shu-jing
Abstract:The engineering background is construction of 1 500‐meter‐deep Auxiliary Shaft in Sishan‐ling Iron Ore ,an overview of the wall’s structure features. According to the conditions of the scene of the shaft wall rock stress and groundwater ,calculate the surrounding rock stress of wellbore wall after excavation by theory ,then judge the stability of borehole wall.On the basis of this ,analyzing the same excavation process of in‐situ stress conditions by FLAC3D ,concluding shaft wall rock and supporting structure after excavation of the size of the displacement and stress distribution and change rule ,for practical engineering guidance and provide a reference for similar projects.
Keywords:deep shaftwalling structurethe stress displacementFLAC3D
Publication Date:2015-11-16
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 84-88 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(z2)