Method of Rapid Construction of Auxiliary Slope in Mayixi No.1 Well
PU Jian-Cheng
WANG Gang
Abstract:In the process of rapid construction of auxiliary shaft in Mayixi No.1 Well of Guizhou ,the penetration into the lane 186.5 m of the local coal and gas outburst mines of slope construction record is created. From the construction mechanization ,assurance of supporting technology ,the labor or-ganization ,construction auxiliary system and incentive measures ,the successful experience of rapid construction for the project is summarized.
Keywords:sloperapidconstructionmethod
Publication Date:2015-10-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 41-43 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(z1)