Methods for Controlling the Whole Process of Freezing Shaft Construction Quality
ZHANG Hai-jiao
ZHANG Ji-bing
TANG Jiang-ming
WANG Cheng-bo
YANG Hai-ruo
TIAN Shao-fei
Abstract:The outer wall of frozen shaft are often damaged by frozen wall design and construction ,cau-sing the damage of outer wall ,tube breakage even flooded accident. We had a few of methods to solve above problems such as increasing frozen section of outer wall ,improving the outer wall concrete grade ,shortening the period of high ,no more effective way to handle that problem. The mine of Hua-inan mining group’s second auxiliary shaft have 340m clay layer ,more than 60% of the total thickness of overburden clay layer section ,including 2 layer thickness swelling of clay ,So the construction is very difficult. In order to ensure safety construction ,we took many prevention methods ,such as pre-dicting temperature field’s temperature control ,controlling accuracy well’s temperature ,setting wall claw and unloading groove ,laying foam board ,controlling the quality of the raw materials for the concrete ,controlling time of cycle and the concrete's raw materials.It realizes quickly and safely through the frozen section without broken tube floods and other accidents.
Keywords:frozen shaftthick clay layerrapid constructionouter wall excavation
Publication Date:2015-10-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 19-22 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(z1)