Mechanized Construction Rapidly by Comprehensive Tunneling Machine in Large Section Frozen Incline Shaft
LU Peng-ju
Abstract:Inclined shaft with rich water quicksand formation adopted comprehensive tunneling machine EBZ160 ,allocated with mechanized operating line like excavator ,6 m3 skip ,integral template loop wheel machine and rail concrete mixing transporter machine ,putting into effect the large section frozen incline shaft of 30 m2 construction safety and rapidly.
Keywords:large section incline shaftfrozenquicksand formationmechanized construction
Publication Date:2015-10-01