Cause Analysis and Prevention Practices on Mine Geothermal Disaster in Construction Mine
ZHANG Chao
Abstract:The mining and heading depth in Pingdingshan Mining Area was reached at 1 000~1 200 m and a high attention and control should be made to the high temperature and geothermal disaster in the construction mine.Based on the analysis on the causes of the geothermal disaster occurred in No.10 Mine of Pingmei Group ,the rational ventilation ,local refrigeration cooling as well as organization man‐agement ,technical management ,medical care and rescue and other comprehensive prevention and con‐trol measures were conducted to improve the operation environment ,to effectively solve the high tem‐perature difficulty in the construction area ,to protect the physical and mental health and safety con‐struction of the construction personnel and to improve the construction efficiency.
Keywords:construction minegeothermal disaster prevention and controlrefrigeration coolingpre-vention and control measures
Publication Date:2015-04-02
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 47-51,21 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(3)