Practices and Analysis on Breakthrough Survey of Horizontal Transportation Roadway in Underground Mine
WANG Jin-hai
Abstract:How to improve a breakthrough precision and quality of an underground mine roadway is al‐ways an issue concerned by the survey workers. The paper briefly introduced the breakthrough survey plan as well as the breakthrough error prediction and the precision analysis condition of the break ‐through measured information of No.3 horizontal transportation roadway in No.6 Mine of Hebi Coal Industry Company.Due the breakthrough survey plan was rational and feasible ,a high precision and high efficient breakthrough of the mine roadway was realized and the breakthrough precision was fully met with the regulation requirements and reached the estimated effect.
Keywords:mine transportation roadwaybreakthrough surveyerror predictionprecision analysis
Publication Date:2015-02-15
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 15-18 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2015,(2)