Study on Optimization of Support Parameters of Large Chamber and Rapid Construction Technology
LIU Hai-sheng
YANG Xin-ping
ZHANG Hao
Abstract:Aiming at the large chamber construction is construction speed is slow and difficult technical problem of branch support.The 100m2 chamber No.1 Wangzhuang coal mine underground reloading of support parameter optimization.In order to solve the problem of slow speed in construction of large chamber.The Wangzhuang coal mine large No.1 reloading chamber in the planned construction of safely and successfully put into use.At the same time as the construction of the same type of big cham-ber to use for reference and guidance.
Keywords:large chambersupport parametersoptimizationspeed