Driving,Bolting and Transportation Mechanized Operation Line of Mine Seam Gateway
SHAO Ze-qu
XU Jin-gen
ZHOU De-zhu
Abstract: No?1 air returning gateway of No? 30201 coal mining face in Mudu Chaideng Mine was driven along a siltstone floor of No?3 - 1 seam ,the designed length of the gateway was 3 473m and a rectan gular cross section of the gateway was supported with a bolt /steel mesh/anchor + bracket combined support system? The gateway was driven and supported with a Sandvik MB670/193 bolter miner .Be hind the bolter miner ,there was a continued haulage and crusher for a stage loading and a belt convey or for coal transportation .A good achievement of a month 530m driving rate was obtained .A safety , excellent quality and fast construction was realized .The paper briefly introduced a matched equipment and technical performance index of the mechanized operation line ,construction technique ,construction management measures and construction effect of the gateway.
Keywords:mine seam gatewaybolter minerbelt conveyormechanized operation lineconstruction technique
Publication Date:2014-07-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 46-50 )
Mine Construction Technology

Mine Construction Technology

ISSN:1002-6029
Year, Vol.(Issue):2014,(5)