Application of Raise Boring Machine to Construction of Muruo Hydropower Station
GUI Liang-yu
Abstract:In the water diversion system project of Muruo Hydropower Station in Malaysia ,there were two vertical shafts with a depth of 163.13m and 159.55m individually and a raise boring project of two pressure regulation shafts with a depth of 73.15m and 73.26m individually.A BMC300 mode raise boring machine was applied to the constructions with high accuracy ,good safety ,rapid construction speed and expected effect. The successful implementation of the raise boring project opened a door to the world of the international hydropower technology for China raise boring technology and increased the influences of China raise boring technology in the world as well as provided the overseas experi-ences.
Keywords:raise boring machinehydropower stationvertical shaftpressure regulation shaft
Publication Date:2014-06-06
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 52-55 )