Assembling Chamber Stabilization Analysis and Construction Dynamic Simulation of Tunnel Boring Machine for Water Tunnel of Dahuofang Reservoir
Li Wenjiang
Liu Zhichun
Gao Chenglei
Machine-generated Keywords:
Publication Date:2004-03-14
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 52-55 )
