Multi-level and Multi-project Optimization Scheduling for Shipbuilding Engineering Based on Chaos Search Intelligent Algorithm
XU Shengchao
LYU Junmin
JIANG Darui
LI Xiangyuan
MAO Mingyang
JIANG Jinling
DAI Zheng
Abstract:A multi-level and multi-project optimization scheduling method for shipbuilding engineering based on chaotic grav-ity search intelligent algorithm is proposed in this paper.By combining constraint conditions and vector solving requirements to ob-tain a Pareto compromise solution set,and a shipbuilding engineering scheduling objective function is generated.By combining the results of multi-objective optimization processing with chaotic search initialization population,randomly inserting processing gene segments selected from the same craft,the approach can preserve the position genes of mutated individuals and finally obtain the op-timal solution.The method effectively avoides the decline in production schedule completion rate caused by conflicts between multi-ple objectives and multi-level and multi-project optimization scheduling in shipbuilding engineering is implemented.The experi-mental results show that the approach had obtained the highest completion rate of scheduling plans under different scheduling time periods,without any abnormal execution problems,and the high utilization efficiency is also acquired.
Keywords:shipbuilding engineeringmulti-levelmulti-projectsoptimization schedulingintelligence algorithm
Publication Date:2025-10-20
Online Publishing Date:2026-01-16(First online date of this platform, not the publication date of the document)
Pages:6( 30-34,48 )
