Analysis and Calculation of Upstream Offset of Underwater Vertical Towed Array
LI Wanpeng
LI Zhisheng
Machine-generated Keywords:
Publication Date:2020-02-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 42-45,92 )
Ship Electronic Engineering

Ship Electronic Engineering

ISTIC
ISSN:1672-9730
Year, Vol.(Issue):2020,40(2)