The phosphorous and nitrogen removal capacity of intermittent aeration process
HUA Guang-hui
ZHANG Bo
HE Guo-fu
Abstract:The continuous flow intermittent aeration process is deve loped through ameliorating the conventio-nal activated sludge process.Lab-scal e experiments were conducted to study the phosphorous and nitrogen removal capacit y of this process.The results of experiments show that the continuous flow inter mittent aeration process is easy to be practised.Stable COD and NH3-N removal efficiencies were realized in experiments.And high nitrogen and phosphorous rem oval efficiencies were also realized under the condition of enough carbon source s.
Machine-generated Keywords:
Publication Date:2001-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 29-32,35 )
ENVIRONMENTAL SCIENCE AND TECHNOLOGY

ENVIRONMENTAL SCIENCE AND TECHNOLOGY

PKUISTIC
ISSN:1003-6504
Year, Vol.(Issue):2001,24(1)