Temperature Control Measures Analysis for Mass Concrete Construction in Shizhen Reservoir
GUO Hongwen
Abstract:The concrete construction volume of the Shizhen Reservoir gravity dam is large,the project is of great importance,and the requirements concrete pouring construction are high.In order to ensure the quality of concrete construction,the temperature control measures for concrete pouring construction are analyzed.The numerical simulation method is used analyze the temperature control effect under different cold water pipe arrangement spacing,and the temperature control effect of each scheme is as follows:0.5 m spacing>1 m spacing>2 m spacing>no water,but the 0.5 m spacing causes a large tensile stress on the concrete surface,which may lead cracks on the concrete surface,so it is recommended to use 1 m spacing to arrange the cold water pipe during the construction process.
Keywords:Shizhen Reservoirconcretetemperature controlnumerical simulation
Publication Date:2026-05-20
Online Publishing Date:2026-09-16(First online date of this platform, not the publication date of the document)
Pages:5( 110-113,134 )
Haihe Water Resources

Haihe Water Resources

ISSN:1004-7328
Year, Vol.(Issue):2026,(5)