Experience and Lessons from the Shisanling Reservoir's Response to the"23·7"Rainstorm and Mountain Flood
WU Guansheng
LI Xiaodong
CHEN Lizhi
CHEN Zhirui
Abstract:From July 28 to August 1,2023,under the influence of Typhoon"Doksuri,"an extremely rare and historic torrential rainstorm occurred in the Haihe River Basin.The Shisanling Reservoir basin experienced a flood exceeding the design standard,and the reservoir implemented its first flood discharge in nearly 25 years.Adhering to the principles of prioritizing people′s lives and safety,the reservoir management office mobilized all staff to actively prepare for the rainfall and manage flood discharge during the rainstorm.Through scientific flood scheduling,timely flood interception and peak-shifting discharge were achieved,minimizing disaster losses and providing solid protection for people′s lives and property.
Keywords:flood responseexperiencelessonsShisanling Reservoir
Publication Date:2025-08-20
Online Publishing Date:2025-09-04(First online date of this platform, not the publication date of the document)
Pages:5( 57-61 )
