Optimization of Roller-Compacted Concrete Dam Construction Based on Real-Time Monitoring and Simulation Technology
YAN Wei
Abstract:The construction process of roller-compacted concrete(RCC)dams is complex,with construction quality and efficiency being influenced by various factors.The integration of real-time monitoring technology and simulation analysis provides an important means for optimizing construction.Based on the Hanzhuang Sluice Project,this study constructs a data-driven construction simulation framework that integrates real-time monitoring data with dynamic simulation models.The reliability of the monitoring data was verified,enabling visualized analysis of the construction process.The results show that after optimizing the construction scheme,the uniformity of dam compaction and construction efficiency were improved,and the accuracy of construction risk prediction significantly increased.The findings demonstrate that this proposed methodology can effectively address practical issues in construction,thereby providing technical support for the intelligent construction of RCC dams.
Keywords:roller-compacted concrete damreal-time monitoringconstruction simulationvisualization analysis
Publication Date:2025-06-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 83-87 )
