Reinforcement Design Scheme for the Lanni'ao Reservoir
WANG Ju
Abstract:In response to the multiple severe cracks detected in the main dam body,the failure of the discharge structures,and seepage issues in the dam foundation of the Lanni'ao Reservoir,reinforcement measures were proposed based on the current status of the dam,engineering geological conditions,and dam construction requirements.The dam reinforcement scheme was introduced in detail,and its effectiveness and stability were evaluated.The evaluation results indicate that the reinforcement scheme can effectively address the existing dam defects.Furthermore,targeted reinforcement measures were provided for issues such as sand flushing holes,discharge structures,and dam foundation seepage.
Keywords:small reservoirrisk elimination and reinforcementdesign
Publication Date:2025-06-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 30-33 )
Haihe Water Resources

Haihe Water Resources

ISSN:1004-7328
Year, Vol.(Issue):2025,(6)