Stability Assessment and Risk Prevention for Demolition and Reconstruction of Small Water Conservancy Projects
WANG Li
Abstract:Taking the demolition and reconstruction project of Yulongqiao Pumping Station in Taihu County as an example,this paper analyzes and evaluates the risk factors of social stability that may arise in the process of demolition and reconstruction of small water conservancy projects.Based on the risk factors,this paper puts forward suggestions and measures for risk prevention and control that are economically applicable and have strong operability,hoping to provide valuable reference for those water conservancy projects facing similar situations.Try to eliminate the disharmonious factors affecting social stability before the implementation of the project,resolve social contradictions,and kill mass emergencies before the bud to ensure the smooth progress of follow-up work.
Keywords:small water conservancy projectsdemolish and rebuildstable evaluationrisk prevention
Publication Date:2025-02-27
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 57-61,88 )
