Influence of Construction Projects on Hydrological Monitoring
GUO Jun-chen
CAO Ya-chang
GUO Sheng-nan
Abstract:Haihe Tide Gate reinforcement project is located within 10 kilometers of Haihe Gate hydrology station,which belongs to the national basic hydrology station.According to the"hydrological monitoring environment and facility protection Measures",the construction unit should take corresponding measures.The station can be constructed only with the consent of the basin management authority or the water administration department that has administrative authority over the hydrological station.In this paper,the influence of Haihe Tide Gate reinforcement project on the monitoring of hydrology station of Haihe sluice is analyzed,and reasonable and feasible remedial measures and suggestions are put forward to reduce or eliminate the influence.
Keywords:water conservancy projectreinforcement projecthydrological monitoringimpact analysis
Publication Date:2024-11-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 125-128 )
Haihe Water Resources

Haihe Water Resources

ISSN:1004-7328
Year, Vol.(Issue):2024,(11)