Thinking on Safety Production Fees of Water Conservancy Construction Projects
LIU Hong-jun
Abstract:The calculation of safety production fees for water conservancy construction projects has different requirements and corresponding calculation methods in the preliminary stage and construction implementation stage.In terms of the management of the use of safety production fees,there are mainly problems such as not separately listing the quotation of safety production fees items in the bidding documents,not specifying the relevant content of safety production fees in the engineering contract,the internal system of contractor is imperfect,the management is not standardized,and the use is not arranged according to the specified scope.In response to these issues,suggestions were proposed to strengthen the management of safety production fees in bidding and tendering work,and to strengthen the internal management by contractor.
Keywords:water conservancy construction projectsafety production feewithdrawal and use
Publication Date:2024-11-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 44-47 )
Haihe Water Resources

Haihe Water Resources

ISSN:1004-7328
Year, Vol.(Issue):2024,(11)