Numerical Simulation Study of the Impact of Deep Foundation Pit Construction on the Original Water Pipeline
ZHANG Lin-lin
WANG Zhuo-ran
YU Ting-ting
Machine-generated Keywords:
Publication Date:2023-10-20
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 87-91 )
Haihe Water Resources

Haihe Water Resources

ISSN:1004-7328
Year, Vol.(Issue):2023,(5)