The analysis of construction technique in stilling basin floor plate patching in flood intake sluice of sin(u)si Water control project
Machine-generated Keywords:
Publication Date:2001-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 27-29 )
HAIHE WATER RESOURCES

HAIHE WATER RESOURCES

ISSN:1004-7328
Year, Vol.(Issue):2001,(4)