Full Simulation Scheme for Nuclear Power Plant I&C System
XU Kui
ZHANG Danhong
Abstract:Full-scope simulator is an essential means of training operators in nuclear power plants.The traditional digital instrumentation system simulation method has such shortcomingsas expensive price,difficult data collection and lack of guarantee of the progress.In this paper,a full-range simulation program of full-range simulator and digital instrumentation system combined with functional simulation and translation simulation is studied.In the early stage of the project,functional simulation is used to ensure the progress of nuclear power plant operator training.In the maintenance stage,translation simulation is usedand the configuration engineering data of the DCS actual unit is used to update the data of the simulator.The results show that the developed DCS simulation software is complete in function and the performance indexes are equivalent to those of the DCS software of the same type of nuclear power,which can meet the needs of simulator training and save the economic costs.
Keywords:nuclear powersimulatorI&Cfull simulation
Publication Date:2017-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 16-18,22 )