Analysis of the influence on the existing structure of the subway under the synergistic effect of the upper cover and the foundation pit
TANG Kang
WANG Guanlu
SI Xiaodong
Machine-generated Keywords:
Publication Date:2022-02-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 44-50 )