Brief Analysis of the Organization and Coordination of the Pre-operation Thermal Smoke Test of Urban Rail Transit
LIU Yifan
Abstract:With the rapid development of urban rail transit in China, a certain number of subway lines are opened every year. According to Safety Evaluation Standard on Trial Operation of Urban Rail Transit, it is necessary to test and evaluate the urban rail transit disaster prevention system by the on-site disaster prevention and safety smoke test, short for hot smoke test. Therefore, it is very important to successfully and efficiently organize a hot smoke test so that the new subway line can be successfully opened. Based on nearly 40 on-site smoke tests, by analyzing the work arrangement of the hot smoke test, this article makes a summary of the matters needing attention throughout the test work, and puts forward some countermeasures for the coordination of experimental organization, so that the hot smoke test can be carried out smoothly.
Keywords:urban rail transitdisaster prevention systemhot smoke testorganize and coordinate
Publication Date:2018-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 99-102 )