Abstract:Three water—inrush incidents happened during mining the coal seam of 3228 working face in Tianzhu Coal Mine, the maximum outflow rate was 77.2m3/h, which seriously threatened the safety produc-tion of 3228 working face.On the basis of fully analyzing the geological and hydrogeological data of mine field and the working face, adopting "Up Three Zone"Theory of coal seam roof ( the caving zone, water flowing fractured zone and bending sinking zone) , principles of hydrogeology and theory of ground surface strata move-ment law, and combining the research results of ground fissure, the water source and mechanism of 3228 working face’ s water-inrush were analyzed.The results showed as follows:in mining the coal seam of 3228 working face, the water flowing fractured zone penetrated Yaojie Formation aquifer, Yaojie Formation aquifer was the main water source of 3228 working face’ s water-inrush;the surface crack could not connect the wa-ter flowing fractured zone, so the water of Jinsha River and Kushuixia Formation aquifer would not rush in the mined-out area of 3228 working face.The working face’ s water quality testing data proved the correctness of the above analysis.On this basis, the outflow rate of 3228 working face was calculated by open well calcula-tion method, the calculating result and the actual value were in general unanimous.And the appropriate meas-ures of water prevention and control was drawn up, it ensured the safety production of 3228 working face.
Keywords:water-inrush mechanismwater prevention and controlwater flowing fractured zoneground fis-sureoutflow rateopen well calculation method
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 1-7 )