Application of TEM Forward and Inveris on Tech nology in Advanced Detecting at Heading Face
ZHAN Wen-feng
Wang Qiang
Abstract:water areas located in lower left of heading forward.According to the results, two verification holes were drilled after tunneling 30m, and the instantaneous water increased suddenly ahead 40m, which ensured the driving safety.
Keywords:TEM forward modelingAnsoft Maxwell 3D softwareAdvanced Detecting
Publication Date:2015-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 39-44 )