Technology and Practice of Crossing Fault at Fully Mechanized Face in Deeply Inclined Coal seams
YANG Sheng
ZHANG Zhi-zhi
PENG Li-hua
LI Han-wen
Abstract:Under the condition of complicated geological structure and "Three Soft",beforehand reinforce-ment,pseudo-inclined adjustment,support net timely laying,plan optimization and other technical measures were took at return airway and belt way fault to reduce the influence scope in Qingshuiying Coal Mine 110205, which let fully mechanized working face go by F8 reverse fault safely and rapidly. So the study provided refer-ence for fully mechanized working face going by passing through fault.
Keywords:Deeply inclined coal seamsFaultReinforced supportFully mechanized face
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:4( 45-48 )
