Analysis on Discontinuous Rib Pillar Waste Filling under Village by Numerical Simulation
WEI Xiao-dong
Abstract:According to difficult problems of Wangzhuang mine in the aspect of under village mining , based of its geological condition , the technical schemes of discontinuous rib pillar waste filling are put forward.By adopting on UDEC numerical simulation , the quantitative and qualitative analysis is made to propose three technical schemes in the aspect of vertical and horizontal displacement of key strata , vertical displacement and velocity of monitoring point in the middle of model , stability of surrounding rock. The optimization technical parameters are obtained on discontinuous rib pillar , and it will supply reference to production practice.
Keywords:under villagediscontinuousrib pillarwaste fillingnumerical simulation
Publication Date:2014-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:7( 27-33 )