The application of“Five in one” Complex ventilation network optimization method to Donghuantuo coal mine
GU Liang
Abstract:Based on the Part of roadway ventilation resistance is too large in Dong huantuo coal mine , the mine ventilation system has been carried on Contains the “five in one” comprehensive analysis of ventilation resistance measuring and calculating optimi -zation analysis、main fan performance parameters of the optimization analysis and dynamic simulation of wind flow MFIRE ventila -tion network simulation analysis through coal mine production plan , later,and according to the results of the analysis ,It put for-ward some optimistic suggetions that are armed at the small cross section of roadway , the bigger leakage air volume , long return airline.Through the implementation of the optimization Suggestions , make the problems of large resistance of roadway in Dong huantuo mine ventilation system has been resolved.
Keywords:ventilation systemsventilation resistanceFive in onesystem optimization
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:3( 17-19 )
