Gas Fathering Scheme Selection of 8104 Comprehensive Mechanized Caving Face in TASHAN Mine on the basis of numerical simulation
NIU Jianhua
Abstract:At first, necessity and feasibility of gas drainage was analyzed in the text about 8104 Comprehensive Mechanized Ca-ving Face in TASHAN Mine , the result shows that it is ncessary for the gas drainage to the working face , and moreover , it is not provided with the conditon for gas pre -drainage in mining seam.Three schemes was brought forward , and they are drainage in the top corner , natural extracting gas through roof roadway and using the pump to extract gas through roof roadway , and these schemes may solve the gas emission from the neighborhood seam and goaf;and then, the gas migration rule was studied in three conditions by making use of numerical simulation , the corresponding distribution of pressure , atmosphere velocity and gas con-centration was obtained in the working face and goaf.The research results are as follows.The drainage in the top corner and u-sing the pump to extract gas through roof roadway may reduce gas concentration in the top corner by a large margin , and at the same time, it is very easy to lead the spontaneous combustion of goaf;natural extracting gas through roof roadway has the ability to resolve the gas question from the top corner basically , and but , it is easy to exceed the limitation for the gas concentration of stope.Therefore , natural extracting gas through roof roadway and spraying surfactant were advised to use for fathering gas .
Keywords:Gas drainagenumerical simulationComprehensive mechanized caving face
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:6( 24-28,43 )
