Limestone Waterburst Mechanism and Prevention Counterme asures from Seam Floor in Xinji No.2 Mine
DING Houwen
Abstract:In this paper, we analyzed the mechanism of water inrush from fault and the mechanism of water inrush from floor fail -ure in Xinjin No.2 Mine.Maximum water inrush fault prediction model and floor failure to establish numerical model were per -formed to simulate the mechanical.Conducting on the water inflow is expected to face exploitation , and proposed water control measures.
Keywords:Limestone Waterburst from Seam Floorwater-inrush mechanismWater Inflowprevention countermeasure
Publication Date:2013-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 15-19 )