Lujiayao coal mine development layout optimization and practice
Abstract:Lujiayao coal mine pillar mining changed to fully mechanized coal mining methods on system development based on the full use of existing roadway, the optimal design, a redistribution of the functions of each wellbore to determine the roadway of the panel location, establishment and improvement of the production system to achieve reasonable focus on the production target, and laid the foundation for building a high yield safe and efficient mine.
Keywords:development layoutoptimizationpracticehigh yield and efficiency
Publication Date:2012-01-01
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:5( 55-59 )