Failure Cause Analysis and Renovating Plan Study on Deepwater Mound Breakwaters
HU Xi-guang
YU Ding-yong
Abstract:Taking breakwater destruction in a coastal shipyard as background ,the meth-od for designing the deepwater mount breakwater is summarized and the requirements of breakw ater in the new and the old specifications are compared .A renovating plan is pro-posed for the breakwater on the basis of analyzing the causes of the breakwater damage in the shipyard and then optimized through experimental verification by using a physical model.
Keywords:deepwater mound breakwaterdestructionfailure cause analysis
Publication Date:2014-01-01
Online Publishing Date:2026-05-22(First online date of this platform, not the publication date of the document)
Pages:8( 47-54 )