Character of Production Planning under the Environment of Extended CorporationLI Sui-cheng, CUI Xian-xia, LIANG Gong-qian1-4
Calculation of Process Capability Indexes for Multi-specification and Small-batch ProductionZHENG Li-wei, LI Cong-dong5-7,11
Analysis of the Process Model of Intelligent Capital Operation in EnterprisesPENG Jia, WANG Jian-yu, FAN Zhi-ping8-11
Vendor Managed Inventory System for Supply Chain ManagementWANG Huai-lin, YANG Min-cai, ZHANG Xiao-feng, ZHANG Xiang-yang12-15
Influence of Reliability and Maintainability on Airplane System EffectivenessMA Li-dong, WANG Li-bo, ZHANG De-bin16-18
Some Problems in the Study of Non-Normal Process Capability IndicesTIAN Zhi-you, TIAN Peng, WANG Huan-chen29-32,44
Comparative Study of Accidents Situation and Analysis Methods Between China and U.S.A Coal Mining IndustryLIU Hong-ye, ZHENG Pi-e37-40,44