A Construction Scheduling Optimization of Prefabricated Buildings Based on Improved NSGA-Ⅱ Algorithm
WANG Heping
GONG Xinglin
LI Yan
Machine-generated Keywords:
Publication Date:2023-04-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:8( 85-92 )
Industrial Engineering Journal

Industrial Engineering Journal

ISTIC
ISSN:1007-7375
Year, Vol.(Issue):2023,26(2)