An Improved Grey Wolf Optimization for Solving Scheduling Problem of Flexible Job Shop with AGV
XU Yifan
ZHANG Liping
TANG Qiuhua
HUANG Yuchen
Machine-generated Keywords:
Publication Date:2021-12-28
Online Publishing Date:2025-08-15(First online date of this platform, not the publication date of the document)
Pages:9( 25-33 )
Industrial Engineering Journal

Industrial Engineering Journal

ISTICPKU
ISSN:1007-7375
Year, Vol.(Issue):2021,24(6)